ISTT s Sheikh Bahai Technopreneurship Festival A Means of Fostering Technology-based Entrepreneurship and Supporting Technopreneurs |
|
1389 |
03 |
Conference |
the XXVII IASP World Conference on Science and Technology Parks |
Two machine flow shop scheduling to minimize the sum of maximum earliness and tardiness |
NULL |
1388 |
09 |
Journal |
|
An exact approach to minimize the sum of maximum earliness and tardiness in single machine scheduling problem with sequence-dependent setup time |
|
1388 |
04 |
Conference |
Flexible Automation and Intelligent Manufacturing 19th international conference (FAIM 2009) |
A branch and bound algorithm for minimizing the sum of maximum earliness and tardiness with unequal release times |
NULL |
1388 |
03 |
Journal |
|
A branch and bound algorithm to minimise the sum of maximum earliness and tardiness in the single machine |
NULL |
1388 |
01 |
Journal |
|
ارزش فعلي خالص جريان هاي نقدي در مسائل زمان بندي تك ماشين و جريان كارگاهي |
NULL |
1387 |
12 |
Journal |
|
A branch and bound algorithm to minimize the sum of maximum earliness and tardiness in single machine |
|
1387 |
11 |
Conference |
ششمين كنفرانس بين المللي مهندسي صنايع |
مسئله دومعياره زمان بندي تك ماشين با رويكرد سيستم ايمني مصنوعي |
|
1387 |
11 |
Conference |
ششمين كنفرانس بين المللي مهندسي صنايع |
مدل ادغامي با تخفيف، فرآيندهاي توليد ناقص، خرابي و ارزش زماني پول |
|
1387 |
09 |
Conference |
ششمين كنفرانس بين المللي مديريت |
An Exact Approach to Minimize the Sum of Maximum Earliness and Tardiness with Unequal Releease Times |
|
1387 |
07 |
Conference |
2008 IEEE International Conference on Service Operations Logistics and Informatics (IEEE/SOLI 2008) |
مدل توليد-موجودي ادغامي با تخفيف مقداري، فرآيندهاي توليد ناقص و خرابي |
|
1387 |
05 |
Conference |
نخستين كنفرانس بين المللي مديريت خريد و تداركات |
مدل يكپارچه موجودي و بازرسي اقلام وارده بادر نظر گرفتن ارزش زماني پول |
|
1386 |
11 |
Conference |
اولين كنفرانس بين المللي انجمن ايراني تحقيق در عمليات |
ارزيابي عملكرد مراكز رشد واحدهاي فناوري و پارك ها به وسيله شاخص ارتقا سطح فناوري |
NULL |
1386 |
10 |
Journal |
|
Net Present Value of Cash Flows in Flow shop Scheduling Problem |
|
1386 |
09 |
Conference |
2nd Tehran International Congress on Manufacuring Engineering |
يك الگوريتم جامعه مورچگان در مساله OpenShop منقطع با هدف كمينه كردن مجموع ديركرد كارهاي نت |
|
1386 |
08 |
Conference |
چهارمين كنفرانس بين المللي نگهداري و تعميرات |
The Infrastructures Programs and the Status of Tenant Companies in Steel Technology Park A Case Study in Isfahan Science Technology Town |
|
1386 |
08 |
Conference |
11th Annual Confrence . IASP Asian Divisions Conference |
An Integrated Multi-Objective Approach to The Flexible Job-Shop Scheduling problem Using Particle Swarm Optimization |
|
1386 |
06 |
Conference |
5th International Conference on manufacturing Research (ICMR 2007) |
حضور واحدهاي فناوري در پارك ها و مراكز رشد علم و فناوري، همسوئي با جهاني شدن تحقيق و توسعه (مطالعه موردي شهرك علمي و تحقيقاتي اصفهان) |
|
1386 |
04 |
Conference |
ششمين همايش بين المللي مراكز تحقيق و توسعه صنايع و معادن |
بررسي اثر تورم و ارزش زماني پول بر روي اندازه دسته توليد با وجود دوباره كاري |
|
1386 |
04 |
Conference |
پنجمين كنفرانس بين المللي مهندسي صنايع |
يك مدل تركيبي با هدف توليد و تخصيص بهينه محصولات به تسهيلات موجود با در نظر گرفتن ارزش زماني پول |
|
1386 |
04 |
Conference |
پنجمين كنفرانس بين المللي مهندسي صنايع |