A branch and bound algorithm to minimize the sum of maximum earliness and tardiness in single machine

A branch and bound algorithm to minimize the sum of maximum earliness and tardiness in single machine
-
ششمين كنفرانس بين المللي مهندسي صنايع
6th International Industrial Engineering Conference

doi
Date : 1387-11
Article type
Conference