Optimizing Hub-And-Spoke Networks Under Demand Uncertainty: A Stochastic Capacitated Single Allocation P-Hub Covering Model with Lagrangian Relaxation
|
# |
|
Journal |
The multiple container loading problem with loading docks
|
10.1111/itor.13393 |
|
Journal |
Integrated timetable rescheduling and rolling stock reassignment for an urban rail transit system during large-scale disruptions
|
# |
|
Journal |
Two New Mixed-Integer Programming Models for the Integrated Train Formation and Shipment Path Optimization Problem
|
# |
|
Journal |
Unrelated parallel machine energy-efficient scheduling considering sequence-dependent setup times and time-of-use electricity tariffs
|
# |
|
Journal |
A relax-and-fix Pareto-based algorithm for a bi-objective vaccine distribution network considering a mix-and-match strategy in pandemics
|
10.1016/j.asoc.2022.109862 |
|
Journal |
New integer programming models for slab stack shuffling problems
|
# |
|
Journal |
Minimizing the number of cancellations at the time of a severe lack of post anesthesia care unit beds or nurses
|
10.1080/00207543.2021.1921874 |
|
Journal |
The split heterogeneous vehicle routing problem with three-dimensional loading constraints on a large scale
|
10.1016/j.ejor.2021.08.025 |
|
Journal |
OPERATING ROOM SCHEDULING CONSIDERING PATIENT PRIORITIES AND OPERATING ROOM PREFERENCES: A CASE STUDY
|
# |
|
Journal |
Single machine scheduling problem of minimising weighted sum of maximum weighted earliness and weighted number of tardy jobs
|
# |
|
Journal |
Minimizing the weighted sum of maximum earliness and maximum tardiness in a single-agent and two-agent form of a two-machine flow shop scheduling problem
|
# |
|
Journal |
Energy-Efficient Scheduling in an Unrelated Parallel-Machine Environment Under Time-Of-Use Electricity Tariffs
|
10.1016/j.jclepro.2019.119393 |
|
Journal |
A diving heuristic for planning and scheduling surgical cases in the operating room department with nurse re-rostering
|
10.1007/s10951-020-00639-6 |
|
Journal |
The re-planning and scheduling of surgical cases in the operating room department after block release time with resource rescheduling
|
# |
|
Journal |
Mathematical Model for Bi-objective Maximal Hub Covering Problem with Periodic Variations of Parameters
|
# |
|
Journal |
Customer's order acceptance and scheduling to maximise total profit
|
# |
|
Journal |
Simultaneous scheduling and lot-sizing with earliness/tardiness penalties
|
# |
|
Journal |
Analyses of the phase I postanesthesia care unit baseline capacity and effect of disruptions to its beds or nurse availability on operating room workflow
|
# |
|
Journal |
A two-agent scheduling problem in a two-machine flowshop
|
# |
|
Journal |