An exact approach to minimize the sum of maximum earliness and tardiness in single machine scheduling problem with sequence-dependent setup time

An exact approach to minimize the sum of maximum earliness and tardiness in single machine scheduling problem with sequence-dependent setup time
يك رويكرد دقيق براي كمينه كردن جمع بيشينه زودكرد و بيشينه ديركرد در تك ماشين با آماده سازي وابسته به عمليات
نوزدهمين كنفرانس بين المللي اتوماسيون انعطاف پذير و توليد هوشمند(FAIM 2009)
Flexible Automation and Intelligent Manufacturing 19th international conference (FAIM 2009)

doi
Article type
Conference
https://people.iut.ac.ir/en/moslehi/content/1658915