AVAILABILITY OPTIMIZATION OF REDUNDANCY ALLOCATION PROBLEM FOR A SYSTEM WITH REPAIRABLE AND NON REPARABLE COMPONENTS
|
1395 - 02 |
System Reliability Modeling with Redundancy Allocation Problem by Considering Degradation Process
|
1395 - 02 |
Investigating the effect of human factors on warranty cost under sales delay conditions
|
1393 - 12 |
Multi-objective availability optimization of a system with repairable and non-repairable components
|
1393 - 12 |
Gauge Imprecision and Process Capability Analysis
|
1391 - 04 |
Electrosprayed PAN Nanoparticle s size based on Response Surface
|
1390 - 12 |
Product Reliability Prediction Model Based on Baysian Approach
|
1390 - 01 |
One-unit repairable systems with active and standby redundancy and fuzzy parameters parametric programming approach
|
1389 - 09 |
The study of multivariate capability indices with respect to gauge measurment capability and dependancy measur of process variables
|
1388 - 08 |
Project time management as a critical risk for S.T.P.C. project
|
1388 - 05 |
Joint Statistcal design of triple sampling X-bar and S charts
|
1387 - 09 |
investigation of material removal rate of aisi D3 tool steel in cylindrical wire EDM (cwedm)
|
1387 - 08 |
multivariate capability index(MCP) with presence of Gauge Measurment Errors
|
1387 - 07 |
Experimental investigation of surface roughness in cylindrial wire electro discharge machining
|
1387 - 07 |
The Effect of Gauge Measurment Errors on Multivariate Process Capability
|
1387 - 05 |