|
Simultaneous Lot Sizing and Scheduling in a Flexible Flow Line
|
# |
|
|
effects of imperfect products on lot sizing with work in process inventory
|
# |
|
|
Which Methodology is Better for Combining Linear and Nonlinear Models for Time Series Forecasting
|
# |
|
|
Which methodology is better for combining linear and non linear models for time series forecasting
|
# |
|
|
A New Hybrid Methodology for Nonlinear Time Series Forecasting
|
# |
|
|
A novel hybridization of artificial neural networks and arima models for time sereies forecasting
|
# |
|
|
AN EXTENDED FUZZY ARTIFICIAL NEURAL NETWORKS MODEL FOR TIME SERIES FORECASTING
|
# |
|
|
an artificial neural network mdel for timeseries forecasting
|
# |
|
|
Guided local search algorithm for hot strip mill scheduling problem with considering hot charge rolling
|
# |
|
|
A novel hybrid algorithm for scheduling steel-making continous casting production
|
# |
|
|
Improvement of Auto-Regressive Integrated Moving Average models using Fuzzy logic and Artificial Neural Networks (ANNs)
|
# |
|
|
A new hybrid artificial neural networks and fuzzy regression model for time series forecasting
|
# |
|
|
The Single-Period (News- vendor) Problem With Stochastic Initial Inventory
|
# |
|