Application of the Fuzzy Auto-Regressive Integrated Moving Average (FARIMA) Model for Iran's Steel Consumption Forecasting
|
|
Component Lot-Sizing in an Assemble-to-Order System with Zero Setup Costs and with a Capacity Constraint
|
|
Minimizing total weighted tardiness in single machine problem with non-identical job size
|
|
A Soft Intelligent Credit Scoring Approach for Credit-Risk Evaluation
|
|
An Enhanced Neural-based Methodology for Combining Linear and Nonlinear Models for Exchange Rate Forecasting
|
|
An Integrated model for non cyclical maintenance planning and production planning
|
|
A Mathematical Model for Profit Maximization General Lot-sizing and Scheduling Problem (PGLSP)
|
|
Stochastic Lot-Sizing Maximising Probability of Meeting Target Profit
|
|
Minimizing Maximum Earliness and Tardiness on a Single Machine using a Novel Heuristic Approach
|
|
foreign exchange rate forecasting using improved artificial neural networks in incomplete data
|
|
Overview and Comparison of Short-term Interval Models for Financial Time Series Forecasting
|
|
Foreign Exchange Rate Forecasting Using Improved Artificial Neural Networks in Incomplete Data
|
|
An Exact Method to Solve Scheduling and Production Smoothing Problem in the Flow Shop Environment
|
|
Simultaneous lot sizing and scheduling in a flexible flow line
|
|
Hot strip Mill Scheduling problem with considering Hot charge
|
|
forcastingthe worldwide billet priceusing a hybrid Auto Regressive Integrated Moving Average model and Fuzzy logic
|
|
MAS Approach to integrating lot sizing and sequencing in dissimilar parallel machines
|
|