Integrated Production and Non-cyclical Maintenance Planning in Flow Shop Environment with Limited Buffer |
NULL |
1402 |
08 |
Journal |
|
Analysis of effective factors on gas leakage of polyethylene pipes for the intelligent forecasting of leakage degree |
NULL |
1401 |
03 |
Journal |
|
Robust Simultaneous Lot-sizing and Scheduling with considering Controllable Processing Time and Fixed Carbon Emission in Flow-shop Environment |
NULL |
1401 |
01 |
Journal |
|
مسئله زمان بندي در محيط كارگاه جرياني تركيبي برگشت پذير |
|
1400 |
06 |
Conference |
هفتمين كنفرانس بين المللي مهندسي صنايع و سيستمها |
Scheduling of Cellular manufacturing system considering price elasticity of demand and varying energy price based on the time of use |
NULL |
1400 |
03 |
Journal |
|
Polynomial-time algorithms to solve the single-item capacitated lot sizing problem with a 1-breakpoint all-units quantity discount |
NULL |
1400 |
02 |
Journal |
|
پيش بيني نشت گاز طبيعي با استفاده از تكنيكهاي داده كاوي، مطالعه موردي: شركت گاز استان اصفهان |
|
1399 |
08 |
Conference |
اولين كنفرانس ملي بهينه سازي سيستم هاي توليدي و خدماتي |
New Quantitative Predictability-Based Method of Risk Measurement to Make Profitable Investment Decisions in Financial Markets |
NULL |
1399 |
06 |
Journal |
|
Bed management with considering bed-blocking and elective patient admissions using simulation optimisation |
NULL |
1398 |
12 |
Journal |
|
Making investment decisions in stock markets using a forecasting-Markowitz based decision-making approaches |
NULL |
1398 |
08 |
Journal |
|
بكارگيري ابزارهاي هوش محاسباتي به منظور پيش بيني مصرف فولاد خام كشور |
NULL |
1398 |
06 |
Journal |
|
A novel flexible model for lot sizing and scheduling with non-triangular period overlapping and carryover setups in different machine configurations |
NULL |
1397 |
09 |
Journal |
|
Simultaneous scheduling and lot-sizing with earliness/tardiness penalties |
NULL |
1397 |
07 |
Journal |
|
بهبود دقت پيش بيني مصرف فولاد خام كشور با استفاده از مدل تركيبي خودرگرسيون ميانگين متحرك انباشته فازي |
|
1396 |
12 |
Conference |
سمپوزيوم فولاد 96 |
تعيين اندازه دسته و زمانبندي روي ماشينهاي موازي با در نظر گرفتن جريمه زودكرد و ديركرد |
NULL |
1396 |
10 |
Journal |
|
A Hybrid Probabilistic Fuzzy ARIMA Model for Consumption Forecasting in Commodity Markets |
NULL |
1396 |
10 |
Journal |
|
بيشينه سازي سود در مسئله دوعاملي پذيرش و زمان بندي يكپارچه سفارشها |
NULL |
1396 |
01 |
Journal |
|
مديريت بهينه زمان در مسائل بودجه بندي سرمايه بازارهاي آتي فولاد با بكارگيري فرايند هاي تصميم گيري هوشمند نرم |
|
1395 |
12 |
Conference |
سمپوزيوم فولاد 95 |
استخراج روابط همبستگي غيرخطي بين فاكتورهاي موثر بر مصرف فولاد خام كشور با استفاده از شبكه هاي عصبي خودسازمان ده |
|
1395 |
12 |
Conference |
سمپوزيوم فولاد 95 |
پيش بيني نقطه اشباع مصرف فولاد خام كشور با استفاده از داده هاي پانلي و نظريه شدت استفاده |
|
1395 |
12 |
Conference |
سمپوزيوم فولاد 95 |