Formulating a design model for product platform architecture adopting integrated design approach considering variety, cost, and accessibility criteria |
10.1007/s11740-023-01224-4 |
|
Journal |
A Combined Model Design for Developing and Optimizing Product Platform Architecture Considering Parameters of DFV, DFC, DFSC, and DFAv case study: phased array radar |
10.22094/JOIE.2023.1981834.2050 |
|
Journal |
A Mixed Integer Linear Formulation and a Grouping League Championship Algorithm for a Multiperiod-Multitrip Order Picking System with Product Replenishment to Minimize Total Tardiness |
10.1155/2022/1382558 |
|
Journal |
طراحي مدل توسعه ي معماري پلتفرم محصول با رويكرد چند هدفه شامل DFC و DFV و DFSC، مطالعه ي موردي: سيستم آنتن آرايه فازي يي |
# |
|
Journal |
Modeling and solution methods for hybrid flow shop scheduling problem with job rejection |
10.1007/s12351-021-00629-2 |
|
Journal |
طراحي مدل توسعه ي معماري پلتفرم محصول با رويكرد چند هدفه شامل DFC و DFV و DFSC، مطالعه موردي: سيستم آنتن آرايه فازي |
# |
|
Journal |
بهينه سازي سيستم برداشت سفارش چند دوره اي و مسيريابي چند سفره برداشت كننده ها با هدف حداقل سازي مجموع ديركرد |
# |
|
Journal |
تحليل پروژه هاي كلان بر اساس ابعاد پايداري و با رويكرد چابكي با استفاده از تحليل پوششي داده ها؛ مورد مطالعه پروژه هاي كلان شهرداري اصفهان |
10.22105/dmor.2021.254777.1244 |
|
Journal |
Agility Factors' Analyses Framework in Project-Oriented Organizations through a Sustainability Approach in Large Projects Case Study: Isfahan Municipality |
10.1155/2021/9629331 |
|
Journal |
Green reverse supply chain network design considering location-routing-inventory decisions with simultaneous pickup and delivery |
10.1007/s11356-021-13770-4 |
|
Journal |
مدل رياضي و الگوريتم فراابتكاري براي مساله زمانبندي جريان كارگاهي تركيبي با منابع دوگانه محدود و در نظر گرفتن رد كارها |
# |
|
Journal |
Nurse scheduling problem by considering fuzzy modeling approach to treat uncertainty on nurses' preferences for working shifts and weekends off |
# |
|
Journal |
A multi-objective vibration damping optimization algorithm for solving a cellular manufacturing system with manpower and tool allocation |
10.24200/sci.2020.52419.2706 |
|
Journal |
A Bi-Level Bi-Objective optimization model for the integrated storage classes and dual shuttle cranes scheduling in AS/RS with energy consumption, workload balance and time windows |
10.1016/j.jclepro.2020.120409 |
|
Journal |
A Mathematical Model for Scheduling Elective Surgeries for Minimizing the Waiting Times in Emergency Surgeries |
# |
|
Journal |
An Integrated Model for Storage Location Assignment and Storage/Retrieval Scheduling in AS/RS system |
# |
|
Journal |