|
A hybrid computational intelligence model for foreign exchange rate forecasting
|
# |
|
|
A comparative study of a hybrid Logit-Fratar and neural network models for trip distribution case of the city of Isfahan
|
# |
|
|
An improved fuzzy risk analysis based on a new similarity measures of generalized fuzzy numbers
|
# |
|
|
A joint lot-sizing and marketing model with reworks scraps and imperfect products
|
# |
|
|
A multi-objective approach to simultaneous determination of spare part numbers and preventive replacement times
|
# |
|
|
Supply Chain Coordination for Minimisation of Total Cost with Credit Period Approach
|
# |
|
|
AN EXTENDED FUZZY ARTIFICIAL NEURAL NETWORKS MODEL FOR TIME SERIES FORECASTING
|
# |
|
|
A Fuzzy Approach to Sequential Failure Analysis Using Petri nets
|
# |
|
|
Supply chain modeling in uncertain environment with bi-objective approach
|
# |
|
|
A Heuristic Algorithm for Minimizing the Expected Makespan in Two-Machine Low Shops with Fuzzy Processing Time
|
# |
|
|
Coordination mechanism for tow-level supply chain with one manufacturer and one buyer under credit period
|
# |
|
|
Optimal lot Size of EPQ Model Cnsidering Imperfect and Defective Products
|
# |
|
|
A new hybrid artificial neural networks and fuzzy regression model for time series forecasting
|
# |
|
|
Flowshop_scheduling problems with makespan criterion a review
|
# |
|
|
Linear bilevel programming by genetic algorithm
|
# |
|
|
A satisfying solution for multi_level programming problem
|
# |
|