|
كمينه كردن مجموع وزني ديركرد در محيط كارگاه جرياني منعطف با ماشين هاي پردازش دسته اي
|
# |
|
|
Minimizing the weighted sum of maximum earliness and maximum tardiness in a single-agent and two-agent form of a two-machine flow shop scheduling problem
|
# |
|
|
Energy-Efficient Scheduling in an Unrelated Parallel-Machine Environment Under Time-Of-Use Electricity Tariffs
|
10.1016/j.jclepro.2019.119393 |
|
|
A diving heuristic for planning and scheduling surgical cases in the operating room department with nurse re-rostering
|
10.1007/s10951-020-00639-6 |
|
|
زمان بندي بيماران همودياليز با در نظر گرفتن ترجيحات بيمار
|
# |
|
|
The re-planning and scheduling of surgical cases in the operating room department after block release time with resource rescheduling
|
# |
|
|
Mathematical Model for Bi-objective Maximal Hub Covering Problem with Periodic Variations of Parameters
|
# |
|
|
Customer's order acceptance and scheduling to maximise total profit
|
# |
|
|
Analyses of the phase I postanesthesia care unit baseline capacity and effect of disruptions to its beds or nurse availability on operating room workflow
|
# |
|
|
Simultaneous scheduling and lot-sizing with earliness/tardiness penalties
|
# |
|
|
A two-agent scheduling problem in a two-machine flowshop
|
# |
|
|
Exact and heuristic algorithms for minimizing Tardy/Lost penalties on a single machine scheduling problem
|
# |
|
|
Minimizing the Number of Tardy Jobs in Single Machine Scheduling Problem under Bimodal Flexible Periodic Availability Constraints
|
# |
|
|
A Benders decomposition approach for order acceptance and scheduling problem a robust optimization approach
|
10.1007/s40314-015-0302-8 |
|