|
شناسايي و اولويت بندي عوامل كليدي موفقيت پياده سازي لجستيك الكترونيك در شهرك سلامت اصفهان
|
# |
|
|
Order acceptance and due-date quotation in low machine rates
|
10.1016/j.apm.2013.10.022 |
|
|
Due-date assignment and machine scheduling in a low machine-rate situation with stochastic processing times
|
10.1016/j.cor.2012.11.013 |
|
|
Machine scheduling in the presence of sequence-dependent setup times and a rate-modifying activity
|
10.1080/00207543.2011.649801 |
|