|
Minimizing the weighted sum of maximum earliness and maximum tardiness in a single-agent and two-agent form of a two-machine flow shop scheduling problem
|
# |
|
|
Energy-Efficient Scheduling in an Unrelated Parallel-Machine Environment Under Time-Of-Use Electricity Tariffs
|
10.1016/j.jclepro.2019.119393 |
|
|
A diving heuristic for planning and scheduling surgical cases in the operating room department with nurse re-rostering
|
10.1007/s10951-020-00639-6 |
|
|
زمان بندي بيماران همودياليز با در نظر گرفتن ترجيحات بيمار
|
# |
|
|
The re-planning and scheduling of surgical cases in the operating room department after block release time with resource rescheduling
|
# |
|
|
Customer's order acceptance and scheduling to maximise total profit
|
# |
|
|
A two-agent scheduling problem in a two-machine flowshop
|
# |
|
|
Maximizing the profit in customer s order acceptance and scheduling problem with weighted tardiness penalty
|
# |
|
|
بيشينه سازي سود در مسئله دوعاملي پذيرش و زمان بندي يكپارچه سفارشها
|
# |
|
|
A Comprehensive Approach for Railway Crew Scheduling Problem (Case Study Iranian Railway Network)
|
# |
|
|
ايمني حمل و نقل جاده اي كشور رويكرد تحليل عاملي
|
# |
|