Skip to main content
خانه
People
Isfahan University of Technology

Finding Contents or People

Project Control
Theory of Elasticity
Morteza Safaei
Farshad Rezaei
mohsen bagheri
Shima Malakoutikhah
Rezaei,Farshad
Mohammad-Reza Ghanei
مهدي حاجي هاشمي- Mahdi Hajihashemi
Conference papers
A HYBRID META-HEURISTIC ALGORITHM TO MINIMIZE THE NUMBER OF TARDY JOBS IN A DYNAMIC TWO-MACHINE FLOW SHOP PROBLEM
Minimizing sum of the due date assignment costs maximum tardiness and distribution costs in a supply chain scheduling problem
Minimizing sum of the due date assignment costs maximum tardiness and distribution costs in a supply chain scheduling problem
A Novel Model for the Time Dependent Competitive Vehicle Routing Problem Modified Random Topology Particle Swarm Optimization
Single machine scheduling problem of minimising weighted sum of maximum weighted earliness and weighted number of tardy jobs

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 47
  • Page 48
  • Page 49
  • Page 50
  • Page 51
  • Page 52
  • Page 53
  • Page 54
  • Page 55
  • …
  • Next page ››
  • Last page Last »

Main navigation

  • Login
  • Manual
  • University Home Page
  • Home
  • Index

Provided by Information Technology Manager of Isfahan University of Technology (https://it.iut.ac.ir)

Support and send ticket

تحت نظارت وف بومی