Finding Contents or People

Displaying 361 - 380 of 89710
361 Design and manufacture of waveguide Basic page
362 Protection and maintenance of a wave buoy device in Amirabad port Basic page
363 Installation of mother stations and buoys in Ashnour Basic page
364 Purchase and delivery of optimization equipment for three waveguides and other measuring devices Basic page
365 Partial design of underwater robot with mechanical arm and presentation of sample production plan (two per thousand) Basic page
366 Operation and protection of equipment for measuring marine characteristics of the country Basic page
367 Construction of twenty booys ready to restrain the ship for use in the operational areas of Kharg Lavan Siri and Bahregan Company (Offshore Oil Company of Iran) Basic page
368 Acquisition of technical knowledge of surface and subsurface floating hydrodynamic tests By equipping the existing water channel with the required sensors and equipment and performing related tests Basic page
369 Inspection, repair and maintenance of marine characteristics measuring equipment Basic page
370 Localization and development of key sub-surface technologies Basic page
371 Preliminary design of mechanical components of a 4.5 MW motor desired by the client Basic page
372 Construction and delivery of ten coastal meteorological stations, phase seven: installation and commissioning of seven equipment and training for operation of phase eight: installation of ten coastal meteorological stations and establishment of seven comp Basic page
373 Preliminary design of mechanical components of a 4.5 MW motor desired by the client Basic page
374 Design, construction, installation and commissioning of the national marine monitoring and forecasting network of the country Basic page
375 Design and construction of short-term wave measuring device Basic page
376 Comprehensive plan for quality control of meteorological, oceanographic and wave data Basic page
377 Appendix No. 1 Analysis of Iran Astara Oceanographic Sphere Data Basic page
378 Causes of premature wear and corrosion of equipment in Dolatabad and Habibabad industrial areas and offering new economic solutions to reduce its effects Basic page
379 Review and analysis of annual data of Astara waveguide Basic page
380 Design and manufacture of 250 kW permanent magnet motor Basic page