|
Joint optimization of inventory planning, maintenance policy and pricing for perishable complementary products by considering the product freshness and technology level
|
10.1007/s40812-021-00201-1 |
|
|
Adaptive Shewhart Control Charts Under Fuzzy Parameters with Tuned Particle Swarm Optimization Algorithm
|
10.1142/S2424862221500226 |
|
|
The effect of gauge measurement errors on double sampling X¯ control chart
|
10.1080/03610926.2021.1958848 |
|
|
Integration of Production Planning, Maintenance Scheduling and Noncentral Chi-square Chart Parameters with Random Failures and Multiple Assignable Causes
|
10.1142/S0219686721500414 |
|
|
تاب آوري زنجيره تأمين در حمل و نقل پستي با رويكرد تحليل عاملي
|
# |
|
|
The effect of parameter estimation on phase II monitoring of poisson regression profiles
|
10.1080/03610918.2018.1429619 |
|
|
Phase I monitoring and change point estimation of autocorrelated poisson regression profiles
|
10.1080/03610926.2017.1402052 |
|
|
An overview on recent profile monitoring papers (2008-2018) based on conceptual classification scheme
|
10.1016/j.cie.2018.10.008 |
|
|
Phase I monitoring of social networks based on Poisson regression profiles
|
10.1002/qre.2273 |
|
|
Phase II monitoring of binary profiles in the presence of within-profile autocorrelation based on Markov Model
|
10.1080/03610918.2016.1249880 |
|
|
Identifying the time of step change and drift in Phase II monitoring of autocorrelated logistic regression profiles
|
10.24200/SCI.2017.4466 |
|