Two-phase approach for designing bus-based park and ride system case study of Isfahan Iran
|
# |
|
An approximation algorithm and FPTAS for Tardy/Lost minimization with common due dates on a single machine
|
# |
|
Outsource Planning Through Option Contracts in Case of Demand and Cost Uncertainty
|
# |
|
Designing a Supply Contract to Coordinate Supplier s Production Considering Customer Oriented Production
|
# |
|
Coordination mechanism for a deteriorating item in a two-level supply chain system
|
# |
|
Managing a new multi-objective model for the dynamic facility layout problem
|
# |
|
Optimal Capacities in Discrete Facility Location Design Problem
|
# |
|
A Model for Locating Park-and-Ride Facilities on Urban Networks Based on Maximizing Flow Capture A Case Study of Isfahan Iran
|
# |
|
A model for measuring the performance of the meat supply chain
|
# |
|
Applying Agent-Based System and Negotiation Mechanism in Improvement of Inventory Management and Customer Order Fulfilment in Multi Echelon Supply Chain
|
# |
|
Synchronization in multi-echelon supply chain applying timing discount
|
# |
|
A Customer-oriented Approach to Warehouse Network Evaluation and Material Flow Determinati
|
# |
|
Facility layout design using virtual multi-agent system
|
# |
|
Application of the SCOR model in supply chain management
|
# |
|
Total operations Solutions
|
# |
|
Real Process improvement using CMMI
|
# |
|
An Integrated quality assurance information system for the design to order manufacturing environment
|
# |
|
A knowledge-based system as a design aid for quality assurance information systems
|
# |
|
A generic IDEF0 model of quality assurance information systems for the design to order manufacturing environment
|
# |
|