Corrosion Lab.

One of the main reasons for the widespread use of the RCPT method is the short time required to perform this test. In this test, the total amount of current passing through a saturated concrete sample at 60 volts over a period of 6 hours is measured. All samples are placed in a 1 mmHg vacuum chamber as standard to ensure saturation.