A solution approach for sponsored search advertising and dynamic pricing for a perishable product and an online retailer with budget constraint
|
#
|
1401 - 12
|
|
Polynomial-time algorithms to solve the single-item capacitated lot sizing problem with a 1-breakpoint all-units quantity discount
|
#
|
1400 - 02
|
|
A hybrid mathematical programming model and statistical approach for bidding price decision in construction projects
|
#
|
1399 - 10
|
|
Stochastic Programming Model for Bidding Price Decision in Construction Projects
|
#
|
1399 - 10
|
|
A game theory approach for determining optimum strategy of claim resolution in construction projects
|
#
|
1398 - 04
|
|
A two-stage heuristic approach for a multi-item inventory system with limited budgetary resource and all-units discount
|
#
|
1397 - 07
|
|
Joint optimization of dynamic pricing and replenishment cycle considering variable non-instantaneous deterioration and stock-dependent demand
|
10.1016/j.cie.2018.06.029
|
1397 - 06
|
|
A HYBRID META-HEURISTIC ALGORITHM TO MINIMIZE THE NUMBER OF TARDY JOBS IN A DYNAMIC TWO-MACHINE FLOW SHOP PROBLEM
|
#
|
1396 - 09
|
|
Efficient force method for tetrahedron finite element analysis using mathematical optimization technique
|
#
|
1396 - 01
|
|
Optimal (r Q) policy in a stochastic inventory system with limited resource under incremental quantity discoun
|
#
|
1395 - 10
|
|
THE PERIODIC GREEN VEHICLE ROUTING PROBLEM WITH CONSIDERING OF TIME-DEPENDENT URBAN TRAFFIC AND TIME WINDOWS
|
#
|
1395 - 10
|
|
OPTIMIZATION OF A PRODUCTION LOT SIZING PROBLEM WITH QUANTITY DISCOUNT
|
#
|
1395 - 09
|
|
Lot Sizing in Supply Chain Scheduling with Two Items Production System and Rework
|
#
|
1395 - 09
|
|
Site dependent vehicle routing problem with soft time window modeling and solution approach
|
#
|
1394 - 09
|
|
A flexibility method for structural damage identification using continuous ant colony optimization
|
#
|
1394 - 04
|
|
An optimal (r Q) policy in a stochastic inventory system with all-units quantity discountand and limited sharable resource
|
#
|
1394 - 04
|
|
JOINT ECONOMIC LOT SIZING PROBLEM IN A TWO ECHELON PRODUCTION SYSTEM WITH FINITE PRODUCTION RATE AND LEAD TIME
|
#
|
1394 - 03
|
|
Capacitated vehicle routing problem with vehicles hire or purchase decision modeling and solution approaches
|
#
|
1393 - 10
|
|
A Hybrid Metaheuristic Algorithm for the Vehicle Routing Problem with Delivery Time Cost
|
#
|
1393 - 04
|
|
Computational complexity analysis of a quantity discount problem algorithm via rooted tree graph model
|
#
|
1391 - 10
|
|