Skip to main content
People
Isfahan University of Technology
Finding Contents or People
Construction and delivery of ten coastal meteorological stations, phase seven: installation and commissioning of seven equipment and training for operation of phase eight: installation of ten coastal meteorological stations and establishment of seven comp
Preliminary design of mechanical components of a 4.5 MW motor desired by the client
Localization and development of key sub-surface technologies
Inspection, repair and maintenance of marine characteristics measuring equipment
Acquisition of technical knowledge of surface and subsurface floating hydrodynamic tests By equipping the existing water channel with the required sensors and equipment and performing related tests
Construction of twenty booys ready to restrain the ship for use in the operational areas of Kharg Lavan Siri and Bahregan Company (Offshore Oil Company of Iran)
Operation and protection of equipment for measuring marine characteristics of the country
Partial design of underwater robot with mechanical arm and presentation of sample production plan (two per thousand)
Purchase and delivery of optimization equipment for three waveguides and other measuring devices
Installation of mother stations and buoys in Ashnour
Protection and maintenance of a wave buoy device in Amirabad port
Design and manufacture of waveguide
Repair of two Bilal platform salt water pumps
Optimization of three waveguide devices and other measuring devices
Design and construction of a ship hull cleaning system in water
Pagination
First page
« First
Previous page
‹‹
…
Page
522
Page
523
Page
524
Page
525
Page
526
Page
527
Page
528
Page
529
Page
530
…
Next page
››
Last page
Last »
تحت نظارت وف ایرانی