Skip to main content
خانه
People
Isfahan University of Technology

Finding Contents or People

Design, construction, installation and commissioning of the national marine monitoring and forecasting network of the country
Construction and delivery of ten coastal meteorological stations, phase seven: installation and commissioning of seven equipment and training for operation of phase eight: installation of ten coastal meteorological stations and establishment of seven comp
Acquisition of technical knowledge of surface and subsurface floating hydrodynamic tests By equipping the existing water channel with the required sensors and equipment and performing related tests
Construction of twenty booys ready to restrain the ship for use in the operational areas of Kharg Lavan Siri and Bahregan Company (Offshore Oil Company of Iran)
Purchase and delivery of optimization equipment for three waveguides and other measuring devices
Design and construction of underwater robot for inspection of underwater oil pipes and platforms (102) (Sadra Company)
Books
Current Courses
Theses Supervised
پایان نامه ها (فارغ التحصیلان )
انتشارات
Biography 42
publication
سوابق آموزشی و تحقیقاتی
PhD Students, Postdocs, and PhD Alumni

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 293
  • Page 294
  • Page 295
  • Page 296
  • Page 297
  • Page 298
  • Page 299
  • Page 300
  • Page 301
  • …
  • Next page ››
  • Last page Last »
Main navigation
  • Login
  • Manual
  • University Home Page
  • Home
  • Index

Provided by Information Technology Manager of Isfahan University of Technology (https://it.iut.ac.ir)

Support and send ticket

تحت نظارت وف بومی