Finding Contents or People

2015-2016 Charachterisation and Processing of Kaolinite ore of Isfahan Province, Funded by the Organization of Mining and Industry of Isfahan province, Isfahan, Iran (Co-worker).
2014-2015 Biooxidation of Iranian Sulphidic Gold Ores, Funded by Science and Technology Vice-Presidency, Iran (project manager).
2013-2014 Feasibility Study for the Production of High Purity Ferrous Sulphate from Zob-Ahan Converter Sludge, Esfahan Steel Company, Isfahan, Iran (project manager).
2012-2013 Biohydrometallurgical Recovery of Cu, Co and Ni from Gol-Gohar iron tailings, GoleGohar Iron Complex, Kerman, Iran (project manager).
2011-2013 Removal of Inorganic Sulfur from Coal in Tabas Coal Processing Plant. Funded by Parvadeh Coal Processing Plant, Tabas, Iran (project manager).
Useful Links
پيوندها
Biography 36
Biography 236
The setting of a standard for Teflon tape
A Closed Recovery Cycle of Reduction of CO2 to CO as a Fuel in the Presence of new Photocatalyst for Energy Saving and Decreasing of Air Pollution, Iran National Science Foundation (INSF), Project No. 90006991, 2013
A Closed Recovery Cycle of Reduction of CO2 to CO as a Fuel in the Presence of new Photocatalyst for Energy Saving and Decreasing of Air Pollution, Iran National Science Foundation (INSF), Project No. 90006991, 2013
The setting of a standard for Teflon tape
Treatment of K562 cells with the various oxicam complexes and the oxicam ligands showed different inhibition effects in a concentration dependent manner. The cell inhibition was measured after 48 h by the MTT assay.
Treatment of K562 cells with the various metal salts showed different inhibition effects in a concentration dependent manner. The cell inhibition was measured after 48 h by the MTT assay. Each data point represents the mean for three separate experiments