Finding Contents or People

Minimizing The Number Of Tardy Jobs Under Piecewise-linear Deterioration
Direct Torque and Flux Regulation of Synchronous Reluctance Motor Drives Based on Input-Output Feedback Linearization
Application of Multiple Linear Regression and Artificial Neural Network Algorithms to Predict the Total Hand Value of Summer Knitted T-shirts
Application of Multiple Linear Regression and Artificial Neural Network Algorithms to Predict the Total Hand Value of Summer Knitted T-shirts
A Pareto Approach to Multi-objective Flexible Job-Shop Scheduling Problem Using Particle Swarm Optimization and Local Search
Molecular dynamics simulation of NMR powder lineshapes of linear guests in structure I clathrate hydrates
Which methodology is better for combining linear and non linear models for time series forecasting
Which Methodology is Better for Combining Linear and Nonlinear Models for Time Series Forecasting
Scheduling linear deteriorating jobs to minimize the number of tardy jobs
Two-agent order acceptance and scheduling to maximize total revenue
Two-agent order acceptance and scheduling to maximize total revenue
APPLICATION OF CONCENTRATION-NUMBER AND CONCENTRATION-VOLUME FRACTAL MODELS TO RECOGNIZE MINERALIZED ZONES IN NORTH ANOMALY IRON ORE DEPOSIT CENTRAL IRAN
APPLICATION OF CONCENTRATION-NUMBER AND CONCENTRATION-VOLUME FRACTAL MODELS TO RECOGNIZE MINERALIZED ZONES IN NORTH ANOMALY IRON ORE DEPOSIT CENTRAL IRAN
A strength Pareto evolutionary algorithm based conflict assessment framework of electricity market participants objectives in generation maintenance scheduling
Due-date assignment and machine scheduling in a low machine-rate situation with stochastic processing times