Finding Contents or People

Spatial prediction of USDA-great soil groups in arid Zarand region Iran comparing logistic regression approaches to predict diagnostic horizons and soil types
Influence of Nb-Microalloying on the Formation of Nano/Ultrafine-Grained Microstructure and Mechanical Properties During Martensite Reversion Process in a 201-Type Austenitic Stainless Steel
Influence of Nb-Microalloying on the Formation of Nano/Ultrafine-Grained Microstructure and Mechanical Properties During Martensite Reversion Process in a 201-Type Austenitic Stainless Steel
Regulation of Blood Glucose Concentration in Type 1 Diabetics Using Single Order Sliding Mode Control Combined with Fuzzy On-line Tunable Gain a Simulation Study
Regulation of Blood Glucose Concentration in Type 1 Diabetics Using Single Order Sliding Mode Control Combined with Fuzzy On-line Tunable Gain a Simulation Study
Investigation of effects of Tension Changes and Types of Shed on Pore-Size Area of Woven Fabric Surface Proceedings of 8th Asian Textile Conf. Tehran
Investigation of effects of Tension Changes and Types of Shed on Pore-Size Area of Woven Fabric Surface Proceedings of 8th Asian Textile Conf. Tehran
Effects of Bread Fortification With Pomegranate Peel Powder on Inflammation Biomarkers, Oxidative Stress, and Mood Status in Patients With Type 2 Diabetes: A Randomized Placebo-Controlled Trial
Comments on "Discovery and primary study of the lithium content in the karst-type bauxite deposit, Jajarm, Iran" by Masoumeh Nikdel, Majid Ghoraee Tafti, and Morteza Nikdel
Drop Structure (Overfall)
Pier Scour
Preparation and characterization of novel optically active nanostructured poly(amide–imide)s-containing (L)-a-amino acid moieties and azobenzene side groups
Science News : Nut Consumption Linked to Reduced Death Rate, Study Suggests
f-MOPSO/Div: an improved extreme-point-based multi-objective PSO algorithm applied to a socio-economic-environmental conjunctive water use problem
Minimizing the weighted sum of maximum earliness and maximum tardiness in a single-agent and two-agent form of a two-machine flow shop scheduling problem