Finding Contents or People

A new model for the redundancy allocation problem with component mixing and mixed redundancy strategy
VALIDATION OF LOCAL THERMAL EQUILIBRIUM ASSUMPTION IN A VASCULAR TISSUE DURING INTERSTITIAL HYPERTHERMIA TREATMENT
Adaptive Tube-Based Model Predictive Control for Linear Systems with Parametric Uncertainty
Adaptive Tube-Based Model Predictive Control for Linear Systems with Parametric Uncertainty
A bi-objective mathematical model for two-dimensional loading time-dependent vehicle routing problem
A bi-objective mathematical model for two-dimensional loading time-dependent vehicle routing problem
A new model for optimising simultaneously projects selection and resource-constrained project scheduling problem
Assessment of Rock Slope Stability at Cham-Shir Dam Power Plant Pit Using the Limit Equilibrium Method and Numerical Modeling.
Assessment of Rock Slope Stability at Cham-Shir Dam Power Plant Pit Using the Limit Equilibrium Method and Numerical Modeling.
Hierarchical Graph Embedding in Vector Space by Graph Pyramid
Hierarchical Graph Embedding in Vector Space by Graph Pyramid
THE PERIODIC GREEN VEHICLE ROUTING PROBLEM WITH CONSIDERING OF TIME-DEPENDENT URBAN TRAFFIC AND TIME WINDOWS
Application of the mixed Weibull distribution in machine reliability analysis for a cell formation problem
A Comprehensive Approach for Railway Crew Scheduling Problem (Case Study Iranian Railway Network)
A Comprehensive Approach for Railway Crew Scheduling Problem (Case Study Iranian Railway Network)