Finding Contents or People

The solution of elastodynamic problems using modified radial integration boundary element method (MRIBEM)
Combining game theory and evolutionary algorithms for optimizing hybrid RDWC-pervaporation-vapor permeation process equipped with solar heating system
A discrete differential evolution with local search particle swarm optimization to direct angle and aperture optimization in IMRT treatment planning problem
Biopolymer-based electrospun fibers in electrochemical devices: versatile platform for energy, environment, and health monitoring
Modeling location-allocation of emergency medical service stations and ambulance routing problems considering the variability of events and recurrent traffic congestion: A real case study
A numerical study of suspension of microdroplets in a channel under uniform electric field at finite electric Reynolds numbers, Melcher-Taylor theory revisited
A mathematical programming model for single round-robin tournament problem: A case study of Volleyball Nations League
Silica aerogel modified electrospun polyacrylonitrile as a sorbent for thin-film microextraction of chlorpyrifos from real samples coupled with corona discharge ion mobility spectrometry detection
Silica aerogel modified electrospun polyacrylonitrile as a sorbent for thin-film microextraction of chlorpyrifos from real samples coupled with corona discharge ion mobility spectrometry detection
New integer programming models for slab stack shuffling problems
New integer programming models for slab stack shuffling problems
Integrated Multi-Level Intermodal Network Design Problem: A Sustainable Approach, Based on Competition of Rail and Road Transportation Systems
Locomotive Assignment Problem with Consideration of Infrastructure and Freight Train Constraints: Mathematical Programming Model and Metaheuristic Solution Approaches
Locomotive Assignment Problem with Consideration of Infrastructure and Freight Train Constraints: Mathematical Programming Model and Metaheuristic Solution Approaches
Prediction and Optimization of Pile Bearing Capacity Considering Effects of Time